- Introduction
-
Evaluation of the ILZRO/RAPS System in Padre Cocha
-
Demand Analysis
- Demand Segment Analysis
- Load Forecast
-
Financial Evaluation
- Capital Costs of the RAPS System and Sources of Funding
- Operation & Maintenance Costs for the RAPS System
- Tariff Structure and Revenues of the RAPS System
- Levelized Cost of the RAPS System
-
Technical Evaluation
- Sizing
- Design and Installation
- Operation and Waste Treatment
- Institutional Evaluation
-
Demand Analysis
-
Recommendations on Future Electricity Supply Options
-
Economic Comparison of Electricity Supply Alternative
- Optimum Sizing Results
- Levelized Cost Comparison
-
Economic Comparison of Electricity Supply Alternative
Documents
Year Published
2007